Kingston Effluent Project
This project includes furnishing all labor, materials and equipment to install Effluent Recharge Site No. 3. Work includes, but not limited to site grading, furnish and install six…
West of Nantucket Water System Expansion


Orleans Meetinghouse Pond Sewer Improvements
Construction of approximately 18,750 linear feet of gravity sewer, 7460 linear feet of force main, 20,750 Linear feet of low pressure sewer and a submersible pump station to provide wastewater service to the Meetinghouse Pond Area of Orleans MA.
Cape Cod Hospital
Remove and dispose of existing site features, remove light bases,
Landscape and millings at Mildreds Lot. Relocate Triplex Pump Panel with new transducer wire.


North Sagamore Water Main
Construction of an approximately 7,000 LF waterline, along with services, and fire hydrants.
Concord Middle School
Sitework, excavation for the support of structures, roadways, and utilities. Provide temporary water to customers and owners trailer. Furnish and install temporary pedestrian travel route, including but not limited to curb cut ramps, sidewalks, signage and painted crosswalks.


JELLYSTONE CAMPGROUND
This campground extension will be finished just in time for summer; offering brand new cabins and a state of the art new waterpark.
Strawberry Hill Road Sewer Expansion
Also known as 830 W Main St., work here began in September of 2021 and is ongoing. For the expansion, 20,500 LF of 8 inch to 15 inch gravity sewer mains is required.


MMA Cadet Housing
Also known as 11 Buttermilk Way, our crews have been at work since February of 2022 developing the full site work for this 30,000 Sq. ft dormitory building for the Massachusetts Maritime Academy Campus.